55 Days Until AUVSI SUAS Competition (June 18th, 2014)

151 Days Until Outback Challenge (September 22nd, 2014)

14 Bugs Closed, 4 Bugs Opened since last meeting

Flight Test Summary

  • Flight test two weeks ago
  • Image capture worked well at 0.5Hz
  • Need faster downlink
  • Need ability to request large versions of images
  • Manual egg drop testing
  • Too fast for previous assumptions...


Imagery

  • CPU usage of all tools reduced
  • Parallelized downlinker
  • May be problematic for large images
  • Images can be requested for downlink or conversion
    • Integrated into Mirage
  • IR capture integrated into software
    • Hardware needs to be integrated into Fenrir
  • Several Mirage bugs fixed
  • Cthulhu and Triton upgraded to Ubuntu 14.04


Water Bottle Drop

  • Wind Tunnel Testing
  • Aero data measured
  • Lift, drag coefficients for drop airspeed envelope
  • Will use to develop drop location algorithm
    • What is terminal velocity?

Odds and ends

  • Old generator - Justin
    • Drop price to $300
  • New attempts at auto-target
  • Off-axis coordinate conversion - Kim
    • Working on it
  • Automatic drop control
    • Cleanup code
  • Egg drop mechanism - Alan
    • Will be done by this weekend
  • Airline Sponsorship - Will
    • Found tax exempt number
  • New nose - Jesse
    • Wanting to work on it
  • Purchase Orders - Joe
    • Palpatine stuff, no Cratos though


Flight Test

  • This weekend?
  • Improved imagery downlink
  • IR image capture?
  • Prepare
    • IR capture hardware integration
    • Full imagery system run on re-installed machines
    • Pack some day?


Outback Challenge Deliverable 2


Open Discussion

  • Availability over the summer
    • Weekend flight tests
    • 2 day, camp out